Permit: TC-RES-0624-03763

Parcel: 141131300

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
09/09/2024 BULD - Electrical Clearance Re-inspection required
09/09/2024 BULD - Electrical Clearance Re-inspection required Not ready MSA in plans call for 60amp in field was 80amp. Revise plans or changes in field. 9/9/2024
09/25/2024 BULD - Electrical Clearance Partial Pass Partial for the 60A meter adapter - DGL Clearance was called into TEP at 11:50am
Pending solar
09/26/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter