Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
10/16/2024 BULD - Electrical Clearance Partial Pass Partial for the 200A service panel upgrade - INCR Clearance to TEP was called into TEP at 12:40pm
Pending solar
11/20/2024 BULD - Electrical Clearance Partial Pass Partial for the Tesla meter adapter - DGL Clearance was called into TEP
Pending solar
12/26/2024 BULD - Electrical Clearance Passed Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter