Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2024 | BULD - Electrical Clearance | Partial Pass | Partial approval for the Tesla meter adapter - DGL Clearance was called into TEP at 9:40am Pending solar |
|
| 09/04/2024 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 09/09/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required |