Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
12/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-3-25: firefoam all penetrations, DWV not under test, add straps to DWV, a 12" clearance is required between pex and can lights-either block using drywall, osb, plywood or relocate pex allowing for clearance requirements, correct tear to flex at bedroom, lower thermostat height to a max of 48" aff, label breakers at panel, missing cold water bond at panel-see plans for details. Reschedule inspection when ready.

NOTE: okay to backfill trench. Backfill 1' of trench and add "caution tape"-provide photo. Then backfill remaining electrical trench using shading materials.
12/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 12-8-25: firefoam thermostat low voltage penetration at top plate, firefoam horizontal penetration at east wall in living room (hosebib), lower thermostat height to 48" o.c., fix tear to flex at bedroom, block or relocate pex from can lights in restroom, label breaker-install weather resistant gfci receptacle with bubble cover at panel, backfill trench using 1' of clean fill-add caution tape-provide photos, and continue with backfill.
12/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/9/2025 all corrections were made.