Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: RSPL - Plumbing Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 09/08/2023 |
RSPL - Plumbing Progress
|
|
Partial Pass |
Partial pass. Okay to backfill trench from meter top 10' from pool equipment due to depth of the trench Not being 18" minimum. Shading is required before backfilling with natural spills. Expose gas line to barbecue, spa and fire place to verify depth and size of pipe. Add supports to gas line that is floating at pool equipment. 9/8/2023 |
| 10/18/2023 |
RSPL - Plumbing Progress
|
|
Passed |
|