Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
|
BULD - Electrical Clearance |
|
Passed |
TEP ECOM |
| 09/26/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
1-Ground rods are less than 6' apart (NEC 250.53(3)). |
| 09/26/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
1-Ground rods are less than 6' apart (NEC 250.53(3)). |
| 09/27/2023 |
BULD - Electrical Clearance |
|
Not Applicable |
duplicate |
| 09/27/2023 |
BULD - Electrical Clearance |
|
Passed |
Approved private MH pedestal unit #186B. No clearance is required on a master meter |