Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2024 | COT - RSBU - Masonry Pregrout | Partial Pass | Partial pass. Total of 5 footers at north side of home per detail. Okay for concrete placement. Pending east end for wood post. 6/13/2024 6/18/24: 5 CMU piers first lift at 4' ok to grout. |
|
| 07/29/2024 | COT - RSBU - Masonry Pregrout | Re-inspection required | Partial pass. Total of 5 footers at north side of home per detail. Okay for concrete placement. Pending east end for wood post. 6/13/2024 6/18/24: 5 CMU piers first lift at 4' ok to grout. 7/29/24: provide fire treated wood listing, No over hang allowed on east side, revise plans prior to final regarding changes at CMU columns. Fire treated wood required all along East side, provided opening from bearing points at existing CMU wall to verify proper installation. |
|
| 09/24/2024 | COT - RSBU - Masonry Pregrout | Passed |