Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2024 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
7/29/24: provide fire treated wood listing, No over hang allowed on east side, revise plans prior to final regarding changes at CMU columns. Fire treated wood required all along East side, provided opening from bearing points at existing CMU wall to verify proper installation. Ok to dry-in north half of roof. East side pending on removal of over hang. |
| 08/06/2024 |
COT - RSBU - Roof NailingĀ |
|
Passed |
|