Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 03/28/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar with batteries - DGC/BAT Clearance to TEP is required for the solar meter |
| 05/02/2024 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial for the line-side tap with 200A disconnect, DGL Clearance was called into TEP at 11:50am - pending Solar |
| 10/24/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial for the line-side tap and meter can, DGL Clearance was called into TEP at 3:25pm |