Permit: TC-RES-0623-05788

Parcel: 138181330


Addresses:

118 E SUSANA ST

Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
03/12/2025 BULD - Electrical Clearance Not Ready not ready no wiring connections to box due to theft
04/21/2025 BULD - Electrical Clearance Re-inspection required 4-21-25, exposed wiring inside of panel and missing dead plate.
05/09/2025 BULD - Electrical Clearance Failed FAILED, permit of the electric service panel upgrade and revision to the plan is required to proceed with electrical clearance. New wiring and no service panel was present at time of inspection
BULD - Electrical Clearance Canceled CA by contractor
06/02/2025 BULD - Electrical Clearance Re-inspection required 4-21-25, exposed wiring inside of panel and missing dead plate.
5/9/25 - FAILED, permit of the electric service panel upgrade and revision to the plan is required to proceed with electrical clearance. New wiring and no service panel was present at time of inspection
6/2/25: revision was submitted and approved but work on site has not been. Completed per plans. Location of new panel is not per approved revision, panel is not ready for clearance. Grounding clamps at ground rods need to be properly secure, dead front must have appropriate cover and service feeders must be installed, please correct all work and install new 200Amp panel.
06/02/2025 BULD - Electrical Clearance Re-inspection required 4-21-25, exposed wiring inside of panel and missing dead plate.
5/9/25 - FAILED, permit of the electric service panel upgrade and revision to the plan is required to proceed with electrical clearance. New wiring and no service panel was present at time of inspection
6/2/25: revision was submitted and approved but work on site has not been. Completed per plans. Location of new panel is not per approved revision, panel is not ready for clearance. Grounding clamps at ground rods need to be properly secure, dead front must have appropriate cover and service feeders must be installed, please correct all work and install new 200Amp panel.
06/23/2025 BULD - Electrical Clearance Passed 6.23.25 TEP INCR code. New panel installed and corrections made per plan via REV1. Deadfront present, address label present, proper securing, bonding and grounding verified.
06/23/2025 BULD - Electrical Clearance Passed 6.23.25 TEP INCR code. New panel installed and corrections made per plan via REV1. Deadfront present, address label present, proper securing, bonding and grounding verified.