Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
08/07/2026 RSBU - Building Final  Re-inspection required Wiring incorrect, back feed should be #3, is #4
08/14/2026 RSBU - Building Final  Passed 08/14/2026
Clearance TEP DGC/BAT. Approved per plan, changed to 3AWG.