Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2026 | RSBU - Building Final | Partial Pass | 9/28/2026 Partial pass. Ensure sub panel is bonded/grounded. Replace breakers with afci breakers. Provide WR receptacles at all outdoor locations. Label j box. Provide full cut off lights at outdoor area. Replace mirage mini split due to not being UL listed. Ensure there is a 3" clearance from grade at unit. Secure new unit to pad. Provide disconnect near and off to the side of unit. Secure seal tight 12" from disconnect. | |
| 11/04/2026 | RSBU - Building Final | Passed | 11/04/2026 All corrections made. |