Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
07/01/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready Provide receptacle to the right of sink area at counter top due to exceeding 4’. As receptacle near refrigerator counter top. Provide receptacle for dishwasher and ensure it is not directly behind appliance. Secure pex lines in place. Provide straps midway at ABS lines. Provide 18” of copper for water heater before transitioning to pex. Move smoke detector over from kitchen area. Provide exhaust fan in bath/laundry room area. Ensure box is flushed to wall and not barrier in bathroom. Provide DWV test. Fire foam all top penetrations. Provide nail plates to lines that are less than an 1 1/4”. Provide ground screws to metal boxes. Provide grommet to metal box. Secure electrical lines north entryway above ceiling. 7/1/2026
07/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass
08/07/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed