Inspection History Details
Inspection Status: Requested
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSEL - Electrical Final | Requested | |||
| 07/29/2026 | COT - RSEL - Electrical Final | Not Ready | 07/29/2026 Not ready, call in at final. Add vapor barrier to T1.11 panel boards, replace stud on east wall that is not flush with top plate. Revise plans to reflect addition of mini-split and electrical load change. |