Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2026 | RSBU - Building Final | Not Ready | 07/29/2026 Not ready, call in at final. Add vapor barrier to T1.11 panel boards, replace stud on east wall that is not flush with top plate. Revise plans to reflect addition of mini-split and electrical load change. |
|
| 08/25/2026 | RSBU - Building Final | Re-inspection required | Not ready, outlets missing | |
| 09/01/2026 | RSBU - Building Final | Re-inspection required | 9-1-26: per previous notes from inspection 7/29/26, an RFI for mechanical & electrical plan with load calculations is required. Also, show disconnect/subpanel on revision. Remove a section of drywall to inspect stud in question at the east side wall-see previous notes for information. Provide documentation for mini split- make sure it is UL Listed. Prior to covering drywall make sure to schedule a drywall screw inspection. All receptacles require covers, light fixtures must be installed for finals, and breakers must be properly labeled. When ready schedule all inspections. | |
| 09/03/2026 | RSBU - Building Final | Re-inspection required | 9/3/26: per previous notes, framing plan required due to size of workshop being greater than 200 sqft. Floor joist must maintain 18" clearance from earth to prevent decay and termite damage, supports of workshop must be designed and approved to support loads, setbacks do not meet approval, additional circuits added to subpanel, subpanel must be type 3r for exterior installation. Mini split is not listed for installation in U.S, Not ready |