Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - BULD - SWG Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2026 | COT - BULD - SWG Clearance | Re-inspection required | 5-15-26: set gauge to 15 psi for a minimum of 10 minutes, install sediment trap, water heater pan, and R3 insulation at hot copper side of water heater. | |
| 05/18/2026 | COT - BULD - SWG Clearance | Passed | 5.18.26 Corrections made, approved for SWG clearance |