Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSME - Mechanical Final 

Date Description Inspector Results Comments
05/15/2026 COT - RSME - Mechanical Final  Re-inspection required 5-15-26: set gauge to 15 psi for a minimum of 10 minutes, install sediment trap, water heater pan, and R3 insulation at hot copper side of water heater.
05/18/2026 COT - RSME - Mechanical Final  Passed