Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 5-12-26: no contact information noted. Gates are locked and there is a "beware of dog" sign posted. I noted from the right of way that the system was not under test and the required tracer wire was missing on the gas line. Note: a 15 pound gauge is required and the system shall be placed under test at 15psi for. Minimum of 10 minutes. Reschedule at your convenience. |
|
| 05/14/2026 | COT - RSPL - Plumbing Final | Passed |