Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2026 | COT - RSEL - Electrical Final | Re-inspection required | O6/15/2026 Neutral and grounding wires are landed on same busbar at subpanel, this is allowed at main service panel only. Refer to 2024 IRC E3607.3.1. |
|
| 06/16/2026 | COT - RSEL - Electrical Final | Passed | 6-16-26: corrections made-electrical final approved. |