Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2026 | COT - RSEL - Electrical FinalĀ | Passed | O5/20/2026 Clearance TEP INCR. Only added surge protector device and rewired branch circuits in attic - meter is set and energized. |