Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Plumbing FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | COT - RSPL - Plumbing FinalĀ | Passed | 6.6.25 SWG clearance code. Pressure verified. Tracer present. Pipe size as per plan. Depth verified. |