Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/05/2025 BULD - Electrical Clearance Passed Passed final 6/5/25 CLEARANCE INCR Ready for cutover
06/05/2025 BULD - Electrical Clearance Re-inspection required gas and water connections must be bonded, additional strap required below roof, bracing required above roof if riser is above 3", all gaps in panel must be filled