Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL clearance was called into TEP Pending solar final |
|
| 07/24/2025 | BULD - Electrical Clearance | Passed | Passed 7/24/25 CLEARANCE DGC/BAT |