Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9.22.25 DWV not under test Tub not under test Secure all electrical runs Fire foam penetrations through top plate Secure plumbing Not ready, inspection stopped, more items may be added upon further inspection |
|
| 09/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Dry in addition. 2-Water heater circuit is incomplete, and not per approved plans. 3- Secure electrical conductors within 12” of sub panel entry. 4- Insulate 3/4” hot water line per Code/Plans. 5-Wiring and receptacle/box are hanging loose in doorway. 6-Fill in concrete in hole under tub, after wrapping piping. Note: If this inspection does not pass next time, a re-inspection fee will be assessed. |
|
| 09/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |