Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch and 175A derate - DGL Clearance was called into TEP at 10am Pending solar final |
|
| 09/19/2025 | BULD - Electrical Clearance | Re-inspection required | 9/19/25 1. Solar panel layout not per plan. Please submit revision. |
|
| 11/07/2025 | BULD - Electrical Clearance | Passed | 11.07.2025 Clearance to TEP DGC/BAT. |