Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | BULD - Electrical Clearance | Passed | 1.8.26 Approved for BAT code to TEP |
|
| 10/09/2025 | BULD - Electrical Clearance | Re-inspection required | 10.9.2025 Plan calls for #8 grounding wires to the Storz batteries - unable to verify equipment grounded. |
|
| 11/06/2025 | BULD - Electrical Clearance | Not Ready | Not ready - did not meet deadline of 330pm | |
| 12/04/2025 | BULD - Electrical Clearance | Canceled | 12.04.225 Canceled by contractor. |