Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | RSBU - Building Final | Re-inspection required | 02/03/2026 Please upload revised plans to TDC online portal reflecting changes in field to line side tap and 60A fused disconnect. |
|
| 04/17/2026 | RSBU - Building Final | Passed | 4.17.26 Approved, corrections made |