Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2024 | COT - RSEL - Electrical Final | Not Ready | ||
| 07/09/2024 | COT - RSEL - Electrical Final | Re-inspection required | Recommend changing stab lock main panel prior to energizing system 7/9/24: Address tag required at meter. |
|
| 07/15/2024 | COT - RSEL - Electrical Final | Partial Pass |