Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter collar - DGL Clearance was called into TEP at 10:30am Pending solar |
|
| 08/05/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery installation with Tesla meter collar - DGC/BAT Clearance to TEP is required for the solar meter |