Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 04/25/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
4/25/25: Hardware at post base and Post to beam not per plan, roof nailing fasteners missing on edge at west half of porch, no overhang permitted of framing members into 3' set back. SET BACKS WERE DISCUSSED WITH OWNER AND ARCHITECT PRIOR TO CONSTRUCTION (All framing members within 3' of the property line must now be fire treated lumber due to non-compliant construction), DDO WILL NEED TO BE REVISED AND RESUBMITTED, |
| 05/15/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
5-15-25, post to beam together with post base hardware not per plans. Have engineer/architect submit a revision to the city for review/approval or make corrections per approved plans. Add nails 12" o.c. in the field and along edges/joints as indicated on the plans. |
| 05/20/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
5/20/2025 approved all corrections were made. |