Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/28/2025 |
COT - RSPL - Plumbing Final |
|
Not Ready |
canceled by contractor |
| 09/02/2025 |
COT - RSPL - Plumbing Final |
|
Not Ready |
Smoke detectors are not inter connected on either unit, anti-tips are not installed on stoves, dishwasher is not installed and do not have hammer arresters, strain relief that needs to be installed on water heater, whip inside closets and large gaps around junction box for water heater whip, please pay sewer, clean out caps grade and PVC is exposed without paint on water heater drains. In master bath water closet appears to have less than 15 inches clearance to the cabinet from centerline. Units are not identified. The address is not identified. Please write plastic piping is installed in electrical panels. |
| 09/04/2025 |
COT - RSPL - Plumbing Final |
|
Not Ready |
|
| 09/05/2025 |
COT - RSPL - Plumbing Final |
|
Passed |
|