Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | BULD - Electrical Clearance | Canceled | CANCELED BY RACHEL | |
| 08/15/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A panel upgrade, INCR Clearance to TEP is required for the cutover Pending solar |
|
| 09/12/2024 | BULD - Electrical Clearance | Not Ready | ||
| 10/03/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |