Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2024 | BULD - Electrical Clearance | Canceled | CA, powerkill was cancelled by TEP | |
| 07/23/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance was called into TEP at 12:45pm Pending solar |
|
| 08/01/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |