Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 5/10/24: seal all penetrations going through top plate (throughout), nail plate missing under kitchen cabinets, properly support feed to water closet in hallway, 18" of copper required before transitioning over to pex at water heater, pex lines above thermal envelope must be insulated, new water main was ran from meter to home without previous inspection (please open up a 2' section at two locations to ensure proper depth and presence of tracer wire). | |
| 05/14/2024 | COT - RSPL - Plumbing Final | Passed | 5/10/24: seal all penetrations going through top plate (throughout), nail plate missing under kitchen cabinets, properly support feed to water closet in hallway, 18" of copper required before transitioning over to pex at water heater, pex lines above thermal envelope must be insulated, new water main was ran from meter to home without previous inspection (please open up a 2' section at two locations to ensure proper depth and presence of tracer wire). 5/14/24: corrections made ok to continue. |