Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 3-5-25, see previous notes. Not ready for plumbing final. | |
| 06/14/2024 | COT - RSPL - Plumbing Final | Not Ready | ||
| 08/21/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 8/21/24 - DENIED- Island gas line not installed per code. 1. Submit detailed plan for island gas run. 2. Submit detailed plan for all other plumbing changes. 3. Submit detailed plan for all interior electric changes. 4. Submit detailed plan for all mechanical changes. 5. Submit detailed plan for all framing changes. 6. Obtain permits and inspections for all work being performed. |
|
| 08/27/2024 | COT - RSPL - Plumbing Final | Not Ready | Failed - detailed revised plans are required for the remodel work being performed, please provide approved plans on site for inspection | |
| 09/10/2024 | COT - RSPL - Plumbing Final | Partial Pass | 8/21/24 - DENIED- Island gas line not installed per code. 1. Submit detailed plan for island gas run. 2. Submit detailed plan for all other plumbing changes. 3. Submit detailed plan for all interior electric changes. 4. Submit detailed plan for all mechanical changes. 5. Submit detailed plan for all framing changes. 6. Obtain permits and inspections for all work being performed. 8/27/24 - Failed - detailed revised plans are required for the remodel work being performed, please provide approved plans on site for inspection 9/10/24: Gas pressure test passed. ok to backfill. shading required. gas piping per plans. Revision required for all other work being done (plumbing, electrical, mechanical, framing) |
|
| 11/25/2025 | COT - RSPL - Plumbing Final | Re-inspection required |