Inspection Status: Re-inspection required

Inspection History: COT - RSOL - Electrical Final Solar Project

Permit Number - TC-RES-0524-02761

Inspection Description - COT - RSOL - Electrical Final Solar Project

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
07/03/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required 7.3.25
No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed.
Either submit a revision or install according to plans.
07/09/2025 COT - RSOL - Electrical Final Solar Project Re-inspection required Failed, installation not per approved plans on file, please revise plans and submit for approval
08/14/2025 COT - RSOL - Electrical Final Solar Project Passed 8.14.25
REVISED PLANS VERIFIED. PV SYSTEM INSTALLED PER REVISED PLANS. APPROVED
DGC/BAT