Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
Permit Number - TC-RES-0524-02761
Inspection Description - BULD - Electrical Clearance
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | BULD - Electrical Clearance | Not Ready | ||
| 05/09/2025 | BULD - Electrical Clearance | Canceled | ||
| 06/13/2025 | BULD - Electrical Clearance | Partial Pass | 6/13/25 TEP CLEARANCE: INCR, called in at 10:39, Tesla switch installed at 1:49, DGL processed by Roman. Pending solar. |
|
| 07/03/2025 | BULD - Electrical Clearance | Re-inspection required | 7.3.25 No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed. Either submit a revision or install according to plans. |
|
| 07/03/2025 | BULD - Electrical Clearance | Re-inspection required | 7.3.25 No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed. Either submit a revision or install according to plans. |
|
| 07/09/2025 | BULD - Electrical Clearance | Not Applicable | duplicate | |
| 07/09/2025 | BULD - Electrical Clearance | Re-inspection required | Failed, installation not per approved plans on file, please revise plans and submit for approval | |
| 08/14/2025 | BULD - Electrical Clearance | Passed | REVISED PLANS VERIFIED. PV SYSTEM INSTALLED PER REVISED PLANS. APPROVED DGC/BAT |
|
| 12/16/2024 | BULD - Electrical Clearance | Canceled | by Contractor |