Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Permit Number - TC-RES-0524-02761

Inspection Description - BULD - Electrical Clearance

Inspection Status - Not Ready

Date Description Inspector Results Comments
04/07/2025 BULD - Electrical Clearance Not Ready
05/09/2025 BULD - Electrical Clearance Canceled
06/13/2025 BULD - Electrical Clearance Partial Pass 6/13/25
TEP CLEARANCE: INCR, called in at 10:39, Tesla switch installed at 1:49, DGL processed by Roman. Pending solar.
07/03/2025 BULD - Electrical Clearance Re-inspection required 7.3.25
No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed.
Either submit a revision or install according to plans.
07/03/2025 BULD - Electrical Clearance Re-inspection required 7.3.25
No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed.
Either submit a revision or install according to plans.
07/09/2025 BULD - Electrical Clearance Not Applicable duplicate
07/09/2025 BULD - Electrical Clearance Re-inspection required Failed, installation not per approved plans on file, please revise plans and submit for approval
08/14/2025 BULD - Electrical Clearance Passed REVISED PLANS VERIFIED. PV SYSTEM INSTALLED PER REVISED PLANS. APPROVED
DGC/BAT
12/16/2024 BULD - Electrical Clearance Canceled by Contractor