Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | RSBU - Building Final | Re-inspection required | 7.3.25 No lineside tap, system is not per plans. Instead a 60A backfeed breaker is installed. Either submit a revision or install according to plans. |
|
| 07/09/2025 | RSBU - Building Final | Not Ready | ||
| 08/14/2025 | RSBU - Building Final | Passed | 8.14.25 REVISED PLANS VERIFIED. PV SYSTEM INSTALLED PER REVISED PLANS. APPROVED DGC/BAT |