Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
04/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready Ground all metal boxes. All receptacles need to be made up. Provide DWV test. Pex lines need to be under pressure. Fire foam all top penetrations. Add fire blocking to soffit areas. Secure loose pex lines. Outdoor water lines need to be copper. 4/4/2025
04/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Ground all metal boxes. All receptacles need to be made up. Provide DWV test. Pex lines need to be under pressure. Fire foam all top penetrations. Add fire blocking to soffit areas. Secure loose pex lines. Outdoor water lines need to be copper. 4/4/2025
5/18/25: pending DWV. Okay to insulate walls without plumbing.
04/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed