Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Ground all metal boxes. All receptacles need to be made up. Provide DWV test. Pex lines need to be under pressure. Fire foam all top penetrations. Add fire blocking to soffit areas. Secure loose pex lines. Outdoor water lines need to be copper. 4/4/2025 | |
| 04/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | Ground all metal boxes. All receptacles need to be made up. Provide DWV test. Pex lines need to be under pressure. Fire foam all top penetrations. Add fire blocking to soffit areas. Secure loose pex lines. Outdoor water lines need to be copper. 4/4/2025 5/18/25: pending DWV. Okay to insulate walls without plumbing. |
|
| 04/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |