Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
COT - RSOL - Electrical Final Solar Project |
|
Re-inspection required |
Failed - #4CU conductor from 100A breaker to equipment should be #3CU per approved plan |
| 07/19/2024 |
COT - RSOL - Electrical Final Solar Project |
|
Passed |
Approved - DGC Clearance to TEP is required for the addition to system and solar meter |