Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Grounding/Bonding Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2024 |
COT - RSOL - Grounding/Bonding Solar Project |
|
Re-inspection required |
NR, conduit bonding is required, removal of metal fence and proper equipment ground at the solar structure |
| 12/05/2024 |
COT - RSOL - Grounding/Bonding Solar Project |
|
Re-inspection required |
12/5/24 underground electrical was backfilled without inspection. |
| 12/06/2024 |
COT - RSOL - Grounding/Bonding Solar Project |
|
Passed |
Installed per plans, grounding and supports per code, CLEARANCE DGC 12/6/24 |