Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2024 | RSBU - Building Final | Partial Pass | PARTIAL PASS 6 - 2' by 42" holes for array poles ok. Conduit from panel to array ok to back fill. |
|
| 11/07/2024 | RSBU - Building Final | Not Ready | ||
| 12/05/2024 | RSBU - Building Final | Re-inspection required | 12/5/24 underground electrical was backfilled without inspection. | |
| 12/06/2024 | RSBU - Building Final | Passed | Installed per plans, grounding and supports per code, CLEARANCE DGC 12/6/24 |