Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter collar, DGL Clearance was called into TEP at 11:40am | |
| 10/17/2023 | BULD - Electrical Clearance | Passed | 10/17/23 - Approved, DGC/DGL clearance to TEP is required for the solar meter 2/15/24 clearance resent |