Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/17/2024 |
BULD - Electrical Clearance |
|
Passed |
Both meters have been installed. No need for clearance. 5/17/2024 |
| 07/11/2024 |
BULD - Electrical Clearance |
|
Passed |
Approved - DGC/DGL clearance to TEP is required for the solar meter |
| 10/13/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
Plans call for 40amp utility meter. Has a 60. Install 40amp or revise plans to show current amperage of meter. |
| 11/28/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
11/28/23 DGL future solar |
| 12/05/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
12/5/23: same problems exist disconnect should also be non fused |