Inspection Status: Passed

Inspection History: COT - RSPL - Rough Soil 

Permit Number - TC-RES-0523-05268

Inspection Description - COT - RSPL - Rough Soil 

Inspection Status - Passed

Date Description Inspector Results Comments
07/21/2023 COT - RSPL - Rough Soil  Passed 7/21/23 Water lines dry need to hold water to determine the leaks or lack there of. filled tested and passed.
08/28/2023 COT - RSPL - Rough Soil  Passed Duplicate inspection. 8/28/2023