Inspection History Details
Inspection Status: Not Ready
Inspection History: Pool/Spa - Pre-Gunite
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2023 | Pool/Spa - Pre-Gunite | Not Ready | rebar is loose throughout the pool. secure rebar. 8/14/2023 | |
| 08/15/2023 | Pool/Spa - Pre-Gunite | Passed |