Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
Permit Number - TC-RES-0523-05096
Inspection Description - BULD - Electrical Clearance
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/19/2023 | BULD - Electrical Clearance | Not Ready | NR, inspection cancelled by Contractor | |
10/10/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance was called into TEP at 2:35pm - pending Solar |
|
11/02/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |