Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2023 | COT - RSME - Mechanical Final | Re-inspection required | 6/23/23: remove deteriorated line-set insulation at the compressor and wrap with UV-resistant tape. Secure non-metallic conduit to disconnect. Maintain min 1"clearance of insulation or combustible materials to furnace vents. | |
| 08/02/2023 | COT - RSME - Mechanical Final | Canceled | Canceled per contractor. Prefer on-site inspection. 8/2/2023 | |
| 08/09/2023 | COT - RSME - Mechanical Final | Re-inspection required (with fee) | 6/23/23: remove deteriorated line-set insulation at the compressor and wrap with UV-resistant tape. Secure non-metallic conduit to disconnect. Maintain min 1"clearance of insulation or combustible materials to furnace vents. Canceled per contractor. Prefer on-site inspection. 8/2/2023 8/9/23: all exterior line set insulation is required to be protected with "UV-resistant tape" . 10 mil tape is not UV-resistant. Maintain minimum 1" clearance from furnace exhaust to all combustibles. 3rd failed inspection, pay a re-fee before scheduling next inspection. |
|
| 09/22/2023 | COT - RSME - Mechanical Final | Passed |