Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| RSBU - Building Final | Re-inspection required | 3/13/25: receptacle spacing at bedrooms and kitchen not code compliant, GFCI required under sink and laundry room, light fixtures must be installed at final, all cover plates must be installed, all receptacles within 6' of water supply must be GFCI, HVAC being over amped, all exterior plastic piping must be coated.Roofing not complete. NOT READY | ||
| 03/24/2025 | RSBU - Building Final | Partial Pass | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |