Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2026 | BULD - Electrical Clearance | Not Ready | 5/14/26 Solar inspections are done via video with the installer. Icon power will need to be on-site and have access to roof to inspect the panels as well. |